Apply SHIM in production

Work with the team that created the method.

Very Big Things helps organizations choose the right first process, build the purpose-built interface around it, connect the systems behind the work, and begin removing manual steps through measured production releases.

Talk to Very Big Things
  1. Choose the Track

    Understand the process, economics, owner, systems, and intended outcome.

  2. Build the interface

    Create the simple operating experience through which the team runs the process.

  3. Begin the SHIM Loop

    Remove high-value manual steps, ship improvements to real users, and measure what changes.

When appropriate, VBT may use TrackFrame as the reusable technical foundation beneath a SHIM implementation.

TrackFrame is not required to understand or use SHIM.